This past week Scooter was on Spring Break. Something you should know about my husband is that he has trouble taking "breaks." The only way to get him to relax is to physically take him out of town to a relaxing place that is preferably warm and has a beach. If you can't get him out of town you might as well accept the fact that he is going to do a house project -it is just inevitable. This time I got lucky and he agreed to tackle our master bathroom. It is the biggest project we have ever under taken, but it has been so much fun and really rewarding. I think we really like doing house projects so much because it is a constant exercise in problem-solving. Every time an issue is resolved there is a sense of victory. It is a little intoxicating and (obviously for us) a bit addicting.
All the pictures this week are pretty much of the bathroom. It might be boring for you folks, but for us they are really exciting. We've been looking forward to doing this project for two years. We haven't felt like we had enough skills to tackle it until now.
We kicked off the week with Scooter's birthday. We kept it really low-key again this year. I made my mom's famous lemon dessert for him - it's one of his favorites. I think Scooter's favorite part of the day was the two hour snuggle that Lincoln gave him while he was on the phone with various birthday well-wishers. Our Lincoln is not a snuggler, so it was a rare treat.

Monday morning bright and early we continued to demo and finally removed the hated gross shower pan. It was definitely the original and was super heavy. I should mention at this point that Scooter has probable broken ribs that he got a few days before this while diving during a racquetball match. Broken (or even severely bruised) ribs make it really hurt to lift heavy things which we obviously needed him to be able to do all week. We had already started the demo and there was basically no turning back so he just worked through it. Consequently, I had to do more of the physical stuff than Scooter would have liked me to do, but it was really fun and empowering. I ripped out all of the subfloor with a crowbar and Scooter replaced it. Then we tore out the ceiling. To give you an idea, the blue tape on the floor is roughly where the new enlarged shower will be in relation to the old shower.

This is the following day after we had been working on the shower. It is going to be about twice the size of the original shower and will have two shower heads. We had the shower drain moved (one of the only things we didn't tackle ourselves) and after we framed the shower in we mixed concrete and poured it into the new shower to make the first layer of the new shower floor. You have to pour the concrete so it slopes gently toward the drain so you won't have any pooling water. Not easy, especially if you've never done it before. Scooter was, as usual, able to figure it out and it looks great. Unfortunately, he cut his thumb really deeply while cleaning one of his tools so he ended up rounding out his day with a quick trip to the emergency room for three stitches (after my insistence - why do men always try to minimize their injuries?). They X-rayed his ribs and confirmed that they probably are broken, but since there is nothing they can do for that injury they sent him home. The splint and stitches aren't helping the work situation, but as usual, Scooter just keeps on working.

This might look really boring to some, but it looks great to us because it means there is now plumbing for two sinks! We won't have to share anymore! Oh yeah, the wall that used to be to the right of the vanity is also gone now. I tore it down all by myself -
Towanda style (if you click the link fast-forward to 4:26, unless of course you want to watch all of it - it's a bunch of great clips from
Fried Green Tomatoes). There was even some kicking through the wall. Seriously. Scooter did all of the electrical work on this day as well. He added an extra light and rewired some things.
The first layer of cement dried and we were ready for the next steps. We put the waterproof membrane on top of the cement pre-slope and then mixed and poured another layer of cement on top - again, making sure it sloped toward the drain. This time we had some plastic spokes to help us. It was really tricky because the shower is an odd shape, but Scooter did a great job. We also put the ceiling back up.
This day we re-leveled the floor, put backerboard on the floor so it is ready to receive tile, and framed in the new pocket door. My favorite part was the giant cabinet that we built. See! It's taller than Scooter. Now I'll have plenty of storage.
We framed the cabinet into the wall and hung the new pocket door. We bought a new fan and Scooter wired that into the shower room and we finished that part of the ceiling. We drywalled the main areas of the bathroom and removed the medicine cabinet. We also built a soffit in the shower room to match the one on the vanity area so the rooms look more unified plus there was some weird stuff going on the attic that we were correcting for. Now it is really starting to look more like a finished bathroom.

I am really so lucky that I have such a hard-working husband. My dad has often said that Scooter is the hardest worker he has ever known and I also think that is true. I think that often if people are left alone on projects they kinda peter out and don't accomplish much, but I frequently will leave Scooter to take care of Lincoln and will come back to find that he's worked himself into a sweat in my absence. He never takes shortcuts and always does things the "right" way. I'm so grateful for him.
Lest you think we abandoned Lincoln this week I thought I'd give you a couple bonus pictures of him.
In Home Depot - one of his favorite places to go.
Sitting in the shower before the second layer of concrete went down. See how big the shower is now?
Playing near us while we worked. This activity jumper has been a lifesaver this week.